JSWESEMAN.COM

Working on a higher plane

Home

Fisher Celebrity

Corvair

5th Bearing

Contact Us

5th BEARING
5th BEARING SOLUTION
 

The Cleanex was designed and built by Dan Weseman.  The Cleanex is comprised of a Sonex airframe from the firewall back and the powerplant  is a  William Wynne style 3100cc Big Boy Corvair engine encased in a custom cowling.  The Cleanex's first flight took place on September 11th, 2005.    Through building and flying the Cleanex we found the need to improve the service life and strength of the Corvair crank shaft by adding an additional bearing on the front of the engine. 

For information on the 5th bearing and to order click on link below
Fly5thBearing.com


Services Offered:
Document
Liability Waiver Please sign and fax to 904-529-1482. Must be received prior to shipping.
  Modify WW style gold or black hub to use stock safety shaft and hybrid studs.  Also retains prop flange location.

BLACK HUB   $95.00   Return shipping included
GOLD HUB    $115.00   Return shipping included

Please send hubs with check enclosed or use PayPal below
J S Weseman
485 Cleveland Ave
Orange Park,Fl. 32065

 

                    BLACK HUB MODIFICATION   $95.00 Shipping included
                     GOLD HUB MODIFICATION   $115.00  Shipping included
TOOL KIT
INSTALL KIT - This kit is necessary for installation of 5th bearing .  It includes drills, reamers and guides, dial indicator and mount to install the housing and dowels quickly and accurately.  Free to use with a $150 refundable deposit.  Please send a separate check for the tool kit deposit.  This check will not be cashed and will be returned to you when you ship back the tool kit. 


$150 refundable deposit

Send Checks to
JSWeseman
485 Cleveland Ave.
Oranges Park,Fl. 32065

Shipping is $15.00.   Please make this check separate from deposit check.

Note:  We have 5 tool kits that are for use.  In order to coordinate use effectively,  we will ship the tool kit one week before you are ready to install.  Just let us know when you are ready.  We ask that you return the kit in a timely manner so it can be passed to the next builder.  We consider a month a reasonable amount of time.   Thanks